Manassas’ Motorist-First Sudley Road Third Lane Project and Its Awful Public Process

The City of Manassas’ upcoming northbound-only Sudley Road Third Lane Project illustrates how the Manassas City Council has, over many years, allowed pro-motoring locality Engineering  and Public Works staff to avoid meaningful public involvement in transportation project development to advance a dismal, anti-pedestrian, largely unnecessary, and counterproductive arterial-road-widening project through a healthcare-focused regionally significant activity center planned for mixed-use, pedestrian-friendly redevelopment (as described on pp. 56-58 in the City’s Comprehensive Plan).

View the City’s project design presentation, which was finally linked from the project webpage on May 28, 2021, one workday before the June 1 project public comment deadline.  View the project area on Google Maps.

The design of this relatively modest $8.4 million project—despite providing some much-needed and long-delayed pedestrian facilities—fails to make Manassas more livable, equitable, or sustainable, because it prioritizes excessively fast travel in motor vehicles over safe, pleasant, and effective non-auto mobility.

Moreover, the chronic lack of timely and impactful public involvement throughout the multi-year development of this City-led transportation project has squandered a valuable opportunity to help transform the City’s Sudley Medical character area into an attractive, mixed-use, walkable, healthcare-focused activity center, by ignoring or undermining the objectives, focus priorities, and design principles outlined on pages 56-58 in the Land Use chapter of the Manassas 2040 Comprehensive Plan.

An Abysmal Public Process

Although this project has been listed with a nutshell description in the City’s Capital Improvement Program (as project #T-015) since 2000, staff work apparently did not begin in earnest until the fall of 2015, when the project was submitted for the Commonwealth Transportation Board’s first round of SMART Scale (HB 2) funding (for FY 2017).  On November 23, 2015, the Manassas City Council adopted a pair of resolutions to support the City’s transportation funding applications, but there was no prior public speaking opportunity.

Ideally, City staff should have begun engaging the community to discuss the scope of this long-planned transportation project at least six to 12 months before applying for any outside funding.  However, the City had no transportation planner at that time, and the City departments responsible for Community Development and Planning and for Public Works and Engineering were siloed at separate locations.

In short, no community meeting or public hearing was ever held to discuss the scope, nature, or particulars of this project until City staff finally held a virtual public information meeting on Tuesday, May 18, 2021, when preliminary engineering was more than 90% complete.  Had the City held such community conversations early and throughout project development, the scope and proposed design of this project would likely have been substantially better.

Originally, the southern terminus of this project was Dorsey Circle, the roadway widening was limited to the short segment between Rolling Road and Godwin Drive, and the scope included undergrounding the NOVEC electric wires on the east side of Sudley Road.  However, in mid-2017, staff determined that the electrical undergrounding would cost more than extending the road widening farther south, to add a third northbound lane to Sudley Road between Grant Avenue and Stonewall Road.

The northbound roadway between Stonewall Road and Rolling Road has long had an essentially continuous right-turn-only lane, as well as two straight-through-only travel lanes, and was never proposed for any additional widening (or sidewalk improvements).

Google Streetview of Northbound Sudley Road across fron Novant/UVA Hospital.  Except to allow through traffic in the rightmost lane, the Third Lane Project will not alter this road segment. The narrow, 4-foot sidewalk is only 2 feet from the roadway and without shade, street lights, or street furniture (except at this single, mid-block bus stop).  The current continuous right-turn-only lane helps buffer the sidewalk from high-speed traffic and also provides bicycle access for traffic-tolerant bicyclists.  The proposed Sudley Road Third Lane Project would essentially extend this pedestrian-hostile street design with three northbound travel lanes the full distance from Grant Avenue to Godwin Drive.

On December 11, 2017, City staff placed a change-of-scope request for this project on the consent agenda for the Manassas City Council.  The project was re-scoped to create a continuous third northbound lane from Grant Avenue to Godwin Dr and to abandon all electric wire undergrounding.  Again, there was no public comment opportunity, community meeting, or public hearing to discuss the re-scoped project, and the Council’s resolution approving the re-scoping falsely stated in part: “WHEREAS, the public involvement process is complete and all resulting comments have been addressed, as needed;”

In February 2021, the project was quietly re-scoped again to add two extra turn lanes on Sudley Road at Godwin Drive for Prince William County’s proposed four-lane Route 28 Bypass in the Flat Branch floodplain.  To accommodate the proposed Bypass, Prince William County has transferred $1.03 million in surplus federal highway (RSTP) funds from a recently completed highway project to the City’s Sudley Road project (see pp. 39-43 here).  This time, not only was there no public comment opportunity, community meeting, or public hearing to discuss these project changes; the changes were not even mentioned on a City Council agenda.  Instead, the fund transfer was discussed and approved at the February 11, 2021 meeting of the Northern Virginia Transportation Authority, with no public comment opportunity.

The Manassas City Council, as the policy-setting body for the City, has both the authority and a public duty to ensure early, continuous, robust, and impactful public involvement in the development of all City-led transportation projects going forward.

A Wasteful, Motorist-First, Pedestrian-Hostile,-and Bicyclist-Unfriendly Street Design

1) Sudley Road already has more than ample capacity for motor vehicles and lacks a traffic congestion problem that warrants a third northbound travel lane. 

This two-way Sudley Road segment carries only 28,000 vehicles/day, a volume well accommodated with only four travel lanes, especially with dedicated left and right turn lanes at every intersection.  By contrast,  nearby Sudley Road in Prince William County carries 38,000 vehicles/day north of Godwin Drive and 50,000 vehicles/day north of Sudley Manor Drive.  For comparison, Grant Avenue by Georgetown South, which the City seeks to squeeze into only two travel lanes, carries 16,000 vehicles/day, and southbound Sudley Road has only two travel lanes and no dedicated right-turn lanes south of Digges Road.

This project’s 2015 SMART Scale application scored very low for congestion-reduction benefits (see page 8 of the referenced application); over 90% of the project’s SMART Scale score (1.7 out of 1.9) was for “transportation-efficient land use” due to its location within a healthcare-focused mixed-use activity center that could be made more walkable and accessible via non-auto travel modes.  In other words, SMART Scale funding was awarded because this project is located where enhanced walkabiity and non-vehicle access is important, not to address any traffic-congestion “deficiency”.

During the development of the City’s Transportation Master Plan (TMP) in 2019, existing arterial roadways and intersections throughout the City were analyzed by a traffic engineering consultant for traffic congestion, both at present and in the year 2040.   As documented on pp. 11-13 of the TMP, Sudley Road has no existing traffic congestion problem between Grant Avenue and Godwin Drive, especially in the northbound direction.  Furthermore, a similar analysis of roadway and intersection performance in 2040–in the absence of any currently non-programed transportation improvements–failed to identify any future traffic congestion problems along this segment of Sudley Road (see pp. 22-23 of the TMP).

Simply put, the repeatedly claims by City staff that this is project is “needed” to relieve traffic congestion and would “improve the capacity of northbound Sudley Road to accommodate vehicular traffic needs” is shear nonsense.

2) The proposed design is blatantly hostile to pedestrians.  The project is designed to move motor vehicles at or above 45 MPH and would shift much of that fast traffic close to a narrow, poorly buffered sidewalk.

Each travel lane would be 12-feet wide, the standard for Interstate highways.  Only one pedestrian crossing signal and marked crosswalk to cross Sudley Road is provided at each signalized intersection, and no mid-block pedestrian crossings or Sudley Road crossings at non-signalized  intersections are accommodated.   At many intersections, pedestrian-unfriendly free-flowing right turns are provided for vehicles entering Sudley Road from side streets.  Higher vehicle speeds greatly increase the incidence and severity of traffic crashes, especially for pedestrians and other vulnerable road users.

This project will provide only narrow 4- or 5-foot sidewalks that are separated from the roadway with just a two-foot grass strip.  Such narrow sidewalks poorly serve two-way foot traffic.  Northbound Sudley Road lacks tree shade, urban street furniture, or pedestrian-scale street lights and offers only widely and irregularly spaced highway-style street lights.  The design also lacks bus stops and bus shelters, except to preserve one mid-block bus shelter opposite the hospital.  This project will not add or upgrade street trees, street lighting, street furniture, or bus stops.  Those were not considerations.

The added lanes on Sudley Road at Grant Avenue, Rolling Road, and especially Godwin Drive would make crossing Sudley Road longer and more treacherous than if those lanes were not added.

3)  The project design lacks promised and planned bicycle facilities which are both needed and eminently feasible.

Although the 2019 Manassas Transportation Master Plan calls for on-road bike lanes on Sudley Road (see maps on pp. 60-61 of the TMP), and project staff had promised to study the feasibility of adding a shared-use path (see page 62 here), the proposed design lacks bicycle accommodations.  Furthermore, the project would eliminate the existing, continuous right-turn lanes that currently do accommodate traffic-tolerant northbound bicyclists.   According to the Bicycle Network Recommendations Prioritization Matrix, conducted in 2019 as part of the development of the City’s Transportation Master Plan (Appendix E),  installing bike lanes on this segment of Sudley Road (Grant Avenue to Godwin Drive) was tied as the most impactful bicycle network improvement identified for the plan.

Turning Lemons Into Lemonade

Since this project will likely be constructed with minimal design changes, two priority modifications merit immediate consideration.  These two alterations would alter the current design by only  changing some proposed pavement markings and roadway signs:

1) In lieu of the unnecessary and pedestrian-hostile third northbound travel lane, stripe and sign a continuous right-hand lane dedicated to right turns, buses, bicycles, and perhaps motor scooters.  

2) Reduce the widths of the three 12-foot northbound travel lanes to 11 feet (or 10.5 feet if necessary) and reallocate 5 feet of roadway space to install bike lanes between the right-hand lane (described in #1 above) and the two straight-through travel lanes.  To make ordinary striped bike lanes on Sudley Road reasonably safe, all right-turning traffic must be channelized in a right-turn-only lane to the right of the bike lane, and the vehicular design speed should be lowered toward 35 MPH, by narrowing the straight-through travel lanes and not expanding their number.

Of course, only a barrier-separated (“protected”) bike lane or an off-roadway shared-use path would provide a low-stress bikeway on Sudley Road serving the “interested, but concerned” “aged-eight-to-eighty” bicycling public.   In addition, if striping similar bike lanes along southbound Sudley Road is not presently feasible beyond Digges Road, shared-lane markings (aka sharrows) might be a necessary, if less desirable, southbound alternative.  However, neither a shared-use path nor a separated bike lane is politically or practically feasible under the current project, and the perfect should not be the enemy of the good.

How You Can Help

Public comments on the design of the Sudley Road Third Lane Project can be submitted at this link.  The previously announced deadline for submitting  those comments is Tuesday, June 1, 2021, but we have requested a two-week extension of that deadline.

There is no deadline to contact the Manassas Mayor and City Council to express your concerns with the project design and/or the awful public process.  The Mayor and City Council are ultimately responsible for setting policies for the City, and they need to hear from their constituents that pedestrian-hostile street designs and the lack of early, robust, and proactive public involvement during the development and funding of City transportation projects are no longer acceptable.

###

Revitalize Yorkshire When Widening Centreville Road

By Rick Holt, Chairman, Active Prince William

Centreville Road in Yorkshire

Active Prince William applauds the Prince William Board of County Supervisors (BOCS) for rejecting the Route 28 2B alignment on August 4 (see Agenda Item #10B, starting at 4:18 on the recorded video).  We further agree that doing nothing to fix Route 28 through Yorkshire is not an option; however, widening Centreville Road itself by adding two general-purpose travel lanes would disrupt many businesses.

VDOT’s Centreville Road (Route 28) STARS (Strategic Targeted Affordable Roadway Solutions) Study, championed by Delegate Roem, recently recommended a $38 million package of intersection, raised median, and pedestrian improvements that–in the absence of general roadway widening–1) would significantly reduce intersection delays and expand vehicle capacity and pedestrian access along Route 28 and 2) was ripe to receive VDOT SMART SCALE funding for design and construction in spring 2021. 

Unfortunately, proceeding with widening Route 28 itself through Yorkshire could make the sensible and cost-effective STARS Study recommendations infeasible.  Therefore, we encourage the BOCS to explore an alternative approach, integrated with a new land-use plan (Small Area Plan) for economic development and revitalization along this corridor. Alternative 4 could be modified to include a new multimodal street just to the west, so highway investment could stimulate transit-oriented, mixed-use redevelopment of the properties between and fronting the existing and future sections of Centreville Road.  Integrated planning could foster the creation of a vibrant new livable community with affordable housing at a key gateway to Prince William County. 

Active Prince William Policy Positions for Active, Equitable, and Sustainable Mobility in Prince William County, Manassas, and Manassas Park (Revised 1/20/2020)

Proposed Prince William County Trails Network from 2007

1) Establish Citizen Transportation Advisory Commissions for Prince William County, Manassas, and Manassas Park.

2) Provide Meaningful and Robust Public Participation Processes for the Coming Comprehensive Plan Updates for the County and Cities.

3) Expand and Enhance Public Transportation as an Effective Travel Choice:

a) Add midday, evening, and reverse-commute VRE trips, possibly as shortened runs to/from Alexandria and/or Springfield/Franconia.

b) Add local and commuter bus service along Rte 28 and Sudley Rd, ideally in dedicated lanes.

c) Extend Richmond Hwy BRT south through Prince William County along the Rte 1 corridor to Quantico.

4) Build Complete Streets, especially a Primary Bikeway Network that Crosses Major Barriers (e.g., rivers, freeways, land parcels):

a) Build a continuous “I-66 Trail”, largely along Balls Ford Rd and across Bull Run into Fairfax County.

b) Build a quality bike/ped crossing of I-66 at or near Sudley Rd/Bus 234.  In short term, ensure space for paths beneath all new I-66 overpasses of Sudley Rd.

c) Retrofit quality bike/ped crossings of I-95, especially at/near Prince Wm Pkwy/Horner Rd and at/near Dale Blvd/Opitz Blvd, but also at/near Rte 123, 234, & Joplin Rd.

d) Complete a continuous trail along Rte 234, from Rte 1 to I-66, including the totally missing segment between Brentsville Rd and I-66.

e) Include quality bike/ped access along and across Flat Branch and Bull Run in the proposed Godwin Dr Extension (Rte 28 environmental assessment).

f) Improve US Bike Route 1, a Maine-to Florida bikeway:  Retrofit paved shoulders along Aden Rd (Joplin Rd to Fleetwood Dr) and Fleetwood Dr (Aden Rd to Fauquier line), fix the Hoadly Rd bike lanes, and sign all of USBR1 in PWC.  Plan and create a paved shared-use path along the perimeter of Quantico Marine Corps Base as a long-term project.

g)  Improve bike/ped crossings of Bull Run and the Occoquan River, including at Old Centreville Rd/Ordway Rd, Rte 28, Yates Ford Rd, I-66 Trail (connect Balls Ford Rd to Bull Run Dr), and Rte 1.

h) Improve bike/ped access along the Rte 29 corridor (Bull Run to Fauquier line).

i)  Establish continuous ped/bike access along Old Bridge Rd.

j)  Plan and develop a bikeway and trail network in Manassas Park.

5)  Develop Livable, Walkable, and Vibrant Transit-Oriented Communities:

a) Plan to revive aging suburban retail corridors and malls for higher-density, mixed-use, bus-transit-oriented redevelopment (e.g., Manassas Mall and the Sudley Rd corridor, Rte 28 in Yorkshire, Rte 1, Dale Blvd, Old Bridge Rd).

b) Remove or scale back all or part of numerous proposed road widenings from the Comprehensive Plan, including Brady’s Hill Rd, Carver Rd, Catharpin Rd, Dale Blvd, Dumfries Rd, Farm Creek Dr, Featherstone Rd, Gideon Dr, Godwin Dr Extension, Gordon Blvd, Groveton Rd, Gum Springs Rd, Horner Rd, Lucasville Rd, Manassas Battlefield Bypass, Neabsco Rd, Old Centreville Rd, PW Pkwy, Signal Hill Rd, Station Rd, Sudley Manor Dr, Sudley Rd, Rte 15, Rte 29, Rte 55, and Wellington Rd.

c)  Innovation Town Center: Plan and develop a robust pedestrian and bicycle network, including a high-quality connection to the north side of the expanded Broad Run VRE Station.

6)  Operate a Vibrant Safe Routes to School Program:

a)  All new public schools, including the 13th high school, should be walkable and bikeable and include quality bicycle parking accommodations.

7)  Make Walking and Bicycling Safer:

a) Improve pedestrian crossings of multilane arterials (e.g., add missing pedestrian crossing signals, Leading Pedestrian Intervals, conspicuously  marked crosswalks, sidewalk bulb outs, and/or streetlights; remove Right-Turn-Only Lanes).

b) Retrofit missing sidewalks along arterial roadways and on walk routes to schools and transit.

c) Provide a signed detour when pedestrian or bicycle facilities are closed for construction or maintenance activities.

8)  Build a Comprehensive Recreational Trails Network:

a) Complete the East Coast Greenway/Potomac Heritage National Scenic Trail shared-use path through PWC, generally between Rte 1 and the Potomac River.

9)  Improve VRE Bicycle Access:

a)  Provide covered bicycle parking and rental bicycle storage lockers at every VRE station in Prince William County, Manassas, and Manassas Park.

b)  Improve bike/ped connections to VRE stations from all directions, including the expanded Broad Run station (including the Broad Run Trail), to improve bike/ped access to VRE from Bristow, the Landing at Cannon Branch, and Innovation Town Center.

c)  Expand VRE bike-on-rail access (long capped at 34 bikes on 17 daily trains).

10)  Provide Ubiquitous, Quality Bicycle Parking Accommodations.

2018 Manassas Community Conversations and Comprehensive Plan Update

Content derived from http://manassascity.org/2431/Comprehensive-Plan-Update

Using an 18-month process, the City of Manassas will update its Comprehensive Plan–the City’s key policy document for land use, development, preservation and related economic and social issues.  As part of that update, the City will also develop its first Transportation Master Plan to guide future transportation investments and improve mobility in the City.  This is an exciting time for City residents as the Manassas community envisions its future!

Citizen input in updating the Comprehensive Plan is vital to a more livable Manassas.  Throughout the summer and fall, the City will host a second round of Community Conversations on key topic areas, like land use and transportation.  These conversations began on June 19th with a visioning session on land use.  Additional meetings are scheduled throughout the summer and fall.  City Staff will also be available to meet with neighborhood and community organizations to gather feedback. Please contact 703-257-8223 for more information about hosting a meeting.

Upcoming Meetings

Parks & Recreation Community Conversation
hosted by the Parks & Recreation Committee
Wednesday, July 11th – 7 PM @ Manassas Museum, 9101 Prince William Street

Community Appearance & Environment Community Conversation
hosted by the Manassas Beautification Committee
Thursday, July 19th – 7 PM @ Public Works, 8500 Public Works Drive

Economic Development Community Conversation
hosted by the Manassas Business Council
Thursday, August 2nd – 12 PM @ Centerfuse, 9071 Center Street

Infrastructure Community Conversations
hosted by the Utility Commission
Thursday, August 9th – 7 PM @ Public Works, 8500 Public Works Drive

Culture & Historic Resources Community Conversation
hosted by the Historic Resources Board
Tuesday, September 4th – 7 PM @ Manassas Museum, 9101 Prince William Street

Community Conversation Town Hall
hosted by the Manassas City Council
Monday, September 17th – 7 PM @ Location TBA

Past Meetings

Comprehensive Plan Kickoff & Community Conversation on Land Use
hosted by the Planning Commission
Tuesday, June 19th– 7 PM @ Boys and Girls Club, 9501 Dean Park Ln.

Land Use Community Conversation Meeting Materials

Land Use Community Conversation Presentation

Additional Resources

About the Update

Current Comprehensive Plan

Community Conversations Phase 1

Sign Up for Updates

View coverage of the Community Conversations Kick Off meeting:

community conversations link

Please visit www.manassascity.org/planmanassas for additional information and additional meeting dates.

City of Manassas Grant Avenue Streetscape Plan Meeting, November 9 @ 7 PM, Georgetown South Community Center

Meeting Address:

http://www.manassascity.org/grantave

Grant Avenue Streetscape Plan

  1. Grant Ave. Streetscape meeting
  2. Grant Ave. Streetscape meeting
  3. Grant Ave. Streetscape meeting
  4. Grant Ave. Streetscape meeting

Share your ideas and vision to help improve the appearance of Grant Avenue. Planning efforts will focus on improving Grant Avenue from Lee Avenue to Wellington Road.

Nov 9 meeting

Grant Ave_Presentation_062916 1
See the June 29 first meeting Presentation

View Meeting Exhibits with Public Comments:

    Existing Conditions

    Map My Walk Aerial

    Precedent Images

    Streetmix Sections