Our Comments on the Thoroughfare Plan Element of the Mobility Chapter in the PWC Comp Plan Update

On June 16, 2021, Active Prince William submitted the following general and specific comments on the Thoroughfare Plan Element of the Mobility Chapter in Prince William County’s Pathways to 2040 Comprehensive Plan


Comments on the Thoroughfare Plan Element of the Mobility Chapter in Prince William County’s Pathways to 2040 Comprehensive Plan

Active Prince William encourages Prince William County to refine its Thoroughfare Plan to support its climate and equity goals.  Please see the attached granular comments on each item in the Thoroughfare Plan that provide a more realistic plan to achieve by 2040.  Below are a few highlights.

  1. Dedicated bus lane infrastructure (Bus Only/BAT[Business Access and Transit]) should be planned for many major roadway arterials (ex. Route 1, Route 234 Business, Dale Blvd, Route 29)
  2. Roadway segments should be identified as “innovative intersection corridors” to replace previously planned lane-mile expansions (ex. Old Centreville Rd, Pageland Ln, Route 234, Prince William Parkway)
  3. Roadways through activity centers and commercial/mixed-use corridors should be redesignated as Urban Boulevards (UB) and Through Boulevards (UTB) (ex. Route 123 and Route 1 in North Woodbridge)
  4. Road diets should be considered for many roadway segments (ex. Occoquan Rd, Williamson Blvd, Lee Hwy/MNBP)
  5. Road capacity expansion should be configured as a managed lane (Toll, HOV, HOT, Bus, BAT). Adding any new unmanaged roadway capacity in the Washington region is unproductive at this point as it relates to future climate and congestion conditions and will only serve to induce SOV travel and increase VMT per capita.
  6. Major “managed lanes” roadway widenings should be packaged with dedicated bus infrastructure on nearby parallel roadways  (234 Bypass -> 234 Business, I-95 HOT ->Route 1)

Click here for our detailed comments on each roadway element in the Thoroughfare Plan.

Our General Comments on Active Mobility and Trails for the Mobility Chapter in the PWC Comp Plan Update

On June 16, 2021, Active Prince William submitted the following general comments on the active mobility and trails element for the Mobility Chapter in Prince William County’s Pathways to 2040 Comprehensive Plan:


Active Prince William’s General Comments on the Active Mobility and Trails Element of the Mobility Chapter in Prince William County’s Pathways to 2040 Comprehensive Plan

1. Active Prince William encourages Prince William County to plan for the expeditious development of a robust, connected, and diverse countywide network of bikeways, walkways, and trails as part of the Mobility Chapter of the Pathways to 2040 Comprehensive Plan.

2. The County should invest in building more “active transportation” infrastructure through 2040 to rebalance the excessive car-centric focus of the past.  A robust, countywide Bicycle and Pedestrian Mobility Plan should be created to identify and prioritize bikeways and walkways that connect all activity centers and provide safe routes to all schools, parks, recreation centers, libraries, transit hubs, shopping centers, and employment sites, so bicycling, walking, and rolling can increasingly replace many short-distance (under 5-mile) motoring trips

3. The Bicycle and Pedestrian Mobility Plan should identify where various types of bikeways, trails, and sidewalks will be completed by 2040.  One goal, synchronized with the Parks, Recreation and Tourism Chapter and the Systemwide Master Plan for county parks, should be to create a connected network of shared-use paths, sidewalks, and bikeways, so all neighborhoods with a density of 4 or more dwelling units/acre are within a 10-minute walk (1/2 mile) of a neighborhood park or school/community-use site.

4. The County should establish a more vigorous and ongoing Active Transportation Program within its Department of Transportation, guided by a comprehensive and strategic Bicycle and Pedestrian Mobility Plan adopted by the Board of County Supervisors. The development of that plan, which could require a year or more of effort and community outreach, should be guided by dedicated in-house transportation planning staff and a diverse citizen task force. An outside consulting firm with strong expertise in active mobility planning (e.g., Toole Design Group or Alta Planning + Design) should be hired to coordinate the development of this Bicycle and Pedestrian Mobility Plan.

5. Formal Complete Streets and Vision Zero policies and action plans–adopted by the Board of County Supervisors following substantial public input–could help guide the County’s development of active mobility infrastructure.

6. The Mobility Chapter should include a table listing specific planned bicycle, pedestrian, and trail facilities, comparable to Table 2 listing the Thoroughfare Plan projects.

7. Appropriate bicycle and pedestrian accommodations should be planned and aggressively implemented, both as an integral component of all roadway widening and reconstruction projects and as standalone projects actively pursued separately from roadway reconstruction, during both scheduled roadway resurfacing and as fully independent projects.

8. A strategic prioritization process should guide the implementation of the standalone bicycle and pedestrian projects. The prioritization process for standalone projects and retrofits should consider many factors, with “opportunity” (such as upcoming roadway resurfacing, grant availability), trip demand, cost effectiveness, equity, and pedestrian safety being key considerations.

9. Bicycling accommodations for collector and arterial road corridors and urban boulevards should not be largely limited to shared-use paths (sidepaths), which are often hillier, more meandering, and less well maintained than the adjacent roadway and frequently interrupted by hazardous motor vehicle cross flows at intersections and driveways. These features make sidepaths much slower and more stressful for bicycling than simply sharing the roadway with vehicular traffic.

10. Whenever feasible, dual bicycling accommodations–both off-roadway (sidepath) and on-roadway (bike lanes, separated bike lanes, paved shoulders, or signed shared roadways)–should be provided to serve the diversity of people who ride bicycles.

11. Roads with Average Annual Daily Traffic (AADT) less than 1,000 vehicles/day generally require no special accommodations for bicycling enthusiasts.

12. Adding paved shoulders (on open-section roadways) or bike lanes (on closed-section roadways with curb and gutter) is appropriate for road cycling enthusiasts and can provide very suitable bicycle accommodations, particularly in the Rural Area.  As traffic speeds and/or volumes increase—and for roads along a designated bike route– the need for (or desirability of) wider paved shoulders or bike lanes or for more separation between the bike lane and the adjacent travel lane (with either a crosshatched buffer or a physical barrier) increases.

13. The Mobility Chapter should include a policy that when the traffic volumes on roads in the Rural Area rise above 1,000 vehicles/day, VDOT will be asked to retrofit modest (2- to 4-foot wider) paved shoulders during scheduled roadway resurfacing, retaining the original 30-foot prescriptive easement. Such modestly widened roadways could then be striped with two 10-foot travel lanes flanked by two 5-foot paved shoulders for walking and bicycling.

14. When any residential development involving 10 or more homes is permitted beside a road without a sidewalk, the developer should be required to build a sidewalk or a sidepath along the road frontage for that subdivision.

15. On roadways where traffic volumes are forecast to exceed 10,000 vehicles/day over the next 20 years, adding a central two-way left-turn lane as well as paved shoulders or bike lanes should be proposed, as an alternative to widening to four or more travel lanes.

16. Roads planned for “Class II” bikeways should be identified as planned for “sidewalks plus bike lanes,” or just for paved shoulders or bike lanes.

17. The current designation for 14-foot “wide” outside lanes (termed “Class III” bikeways) should be eliminated. All of those roads should be re-designated for bike lanes (aka “Class II” bikeways). If multilane roads are simply striped with 11-foot travel lanes instead of the Interstate-regulation 12-foot travel lanes, a 14-foot outside lane becomes at least 16 feet wide, which is wide enough to allocate as a 5-foot wide bike lane plus an 11-foot travel lane.  Thus, the category of “wide outside lanes” is not only a poor bicycling accommodation; it’s a completely unnecessary category.

18. Signed shared roadways (e.g., relatively low-speed collector roads with shared-lane markings (a.k.a. “sharrows”) or low-traffic residential subdivision streets with way-finding signs) are the only “Class III bikeways” that should remain.

19. Signed shared roadways should be planned only where traffic speeds and volumes are relatively low, and bike lanes are either infeasible or unnecessary due to low traffic speeds and volumes.  This category should be designated as “Sidewalks and Shared Roadways”, rather than as “On-Road Trails.”

20. The Vision Zero strategies appropriate for different areas in Prince William should be identified and incorporated in all transportation planning.  Crashes involving a vehicle with a bike or pedestrian should be reported as a “vehicle-bike crash” or “vehicle-pedestrian” crash, not as “bike crash” or “pedestrian crash”.  Since vehicle speed greatly influences the severity of such crashes, VDOT and the County Department of Transportation should seek to lower the design speeds and posted speed limits on roads within activity centers, and emerging technologies, such as automated speed enforcement, should be used to reduce speeding. Particular attention should also be paid to minimizing risk when designing intersections that permit right turns on red and intersections where people walking or bicycling must cross two or more lanes of free-flow traffic.

21. Since transportation is our largest source of greenhouse gas emissions, and Prince William has committed to reduce these emissions by 2030 to 50% of the 2005 level, the County should quantify the greenhouse gas emission impacts of proposed new transportation projects, including trails, for the county’s Climate Action Plan.

22. For shared-use paths, bike lanes, and sidewalks maintained by the county, rather than VDOT or an HOA, the PW County Departments of Transportation and of Parks, Recreation and Tourism should budget annually for routine maintenance as well as for capital maintenance (e.g., periodic repaving).  That includes removing storm debris, managing winter snow and ice, mowing grass, and removing encroaching vegetation.

23. For Traffic Impact Analyses, the county should report average pedestrian delay at intersections together with reports of average vehicle delay, and calculate bicycle and pedestrian Levels of Service and/or Comfort, comparable to calculating Level of Service for Vehicles.  Intersections should be designed to balance delays for bicyclists/pedestrians as well as delays for vehicles.

Register Now for Bike-to-Work Day on Friday, May 21, 2021

 

Bike-to-Work Day (BTWD) Metro DC is traditionally held on the third Friday in May.  For the past 20 years, the event has been organized and promoted annually throughout the metropolitan Washington DC region by the Washington Area Bicyclist Association and the Metropolitan Washington Council of Governments’ (MWCOG) Commuter Connections program.

The event celebrates bicycling as a viable commuting  mode and encourages all commuters to try bicycling for all–or for just one segment–of their work commute trip .  Teleworkers are also welcome to participate, by bicycling to one of the roughly 90 BTWD rally locations (known as ‘pit stops’) throughout the Washington region and then bicycling home for their workday.

As most people know, bicycling is healthy, clean, economical, and fun.  Bicycle commuting is energy efficient, reduces traffic and parking congestion,  improves air quality, increases employee morale and productivity, and can lower employer healthcare costs.

Register for Bike-to-Work Day now, so you don’t miss out on the fun (and BTWD swag).

Bike to Work Day was canceled in 2020 due to COVID-19 concerns, but it ‘s back this year, with some COVID precautions in place at each BTWD pit stop.

This year,  seven Bike-to-Work Day pit stops will be held throughout the Prince William area.  At these locations, participants can pick up a BTWD t-shirt, water bottle, and snacks.  Participants should register online in advance and  show up at their selected pit stop at their scheduled check-in time with a mask on and maintain social distancing.

Click on the links below to learn the exact locations, hours of operation, and contacts for the seven Prince William area pit stops.

Bike-to-Work Day proclamations have been issued this year by the National Capital Region Transportation Planning Board, by the Prince William Board of County Supervisors, and by the Manassas City Council.

In the United States, the League of American Bicyclists established National Bike Week (now National Bike Month) in 1956, emulating an event begun in the United Kingdom in 1923.  The Washington Area Bicyclist Association organized DC-based Bike-to-Work Day events on Earth Day (April 22) for several decades until MWCOG’s Commuter Connections program adopted BTWD Metro DC as a region-wide event.

PW County to Host Route 28 Bypass Project Virtual Public Meeting, Thursday, Feb. 18, at 7 PM

Press Release, February 3, 2021
Department of Transportation, 703-792-6273, [email protected]

The Prince William Board of County Supervisors and County transportation staff invite you to attend a virtual information session regarding the Route 28 Bypass project on Thursday, Feb. 18, 2021, at 7:00 p.m. This approximately $300 million infrastructure project, one of the largest in the history of Prince William County, will reduce traffic congestion, improve travel reliability and address other transportation challenges in the area.

The meeting will inform residents about the project’s background, its current status and aspects of the Route 28 Bypass that most directly impact Prince William County residents. While there are no major updates on the project at this time, the session will provide a baseline of information about the Route 28 Bypass while also sharing planned communication activities that will help citizens remain informed and involved as the project moves forward. The latest information about the project is available on Route28Bypass.com.

The Prince William County Department of Transportation (PWC DOT) will continue to host information sessions on the Route 28 Bypass project and address topics specific to Prince William County as the project progresses.

The public is invited to ask questions and provide feedback during the presentation. You may also submit questions or comments before using any of the mechanisms below.

Meeting Registration Information

  • Register to attend the Route 28 Bypass Virtual Meeting:

https://theclearing.zoom.us/webinar/register/WN_P47suUPqQ0O0x1ZBK8KVlA

  • Dial In: +1-301 715 8592 | Webinar ID: 920 6806 7097 | Passcode: 397360

Please submit questions/comments about the Route 28 Bypass using one of the methods below. Submissions received before Feb. 18 at 5 pm may be addressed during the meeting. All questions will be responded to in a timely manner via email or route28Bypass.com.

Have thoughts on how to enhance communication efforts going forward? Please submit any feedback, comments, questions or concerns to PWCDOT: